The Smart Bump
Would you like to react to this message? Create an account in a few clicks or log in to continue.

...( PDS )...

Go down

...( PDS )... Empty ...( PDS )...

Post by Abrar Fri May 27, 2011 5:50 pm

18.0 Company Constraints

18.1 None - accept those outlined in Manufacturing and Processes.

19.0 Processes

19.1 All components to be of metric form.

19.2 Check manufacturing processes.


20.0 Safety

20.1 No smart bump will plastically deform.

20.2 Smart bump will not operate when maintenance is being carried out.

20.3 Indication will be sent when the bump is not functioning.


21.0 Testing

21.1 Testing is to be carried out on all the units.

22.0 Installation

22.1 The product will be installed by professionals.

23.0 Documentation

23.1 Product will be supplied with a user manual covering smart bump operation and maintenance.

23.2 Suppliers require maintenance and repair manual.



24.0 Disposal

24.1 Plastic parts will be separable and marked to aid disposal.

24.2 Rubber parts will be separable and marked to aid disposal.

24.3 Steel parts will be separable and marked to aid disposal.



Abrar
Admin

Posts : 44
Join date : 2011-05-12

Back to top Go down

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum